SB Rail Kirow cranes deliver on Liverpool Lime Street Upgrade
31st October 2017Between the 30th of September and 22nd of October two SB Rail Kirow 250 cranes supported the S&C North Alliance replacing almost 2,000m of track at Liverpool Lime Street. The Phase 1 works included the redesign and lengthening of existing platforms and the construction of two new platforms (7 and 8). The cranes were deployed […]
Read more